Project Description

Fabrication and replacement of process piping

This project scope covers the following activities:

  • Removal of existing damaged cooling water piping.
  • Supply, fabrication, erection, blasting and painting of about 12000 inch meters of chilled water piping.
  • Supply, fabrication and erection of about 3000 inch meters of SS hot oil piping.
  • Supply and erection of about 20 tons of steel pipe racks and supports.
  • Supply of new pumps and valves and refurbishment of existing equipment.

Project Details

CLIENT

JBF RAK LLC

LOCATION

AL Jazeerah Al Hamra, Ras Al Khaimah, UAE.

Photo